Thursday, May 1, 2008

Cabin Soles, Interior Trim, Misc.

Aft Cabin Companionway Steps (top two remove for engine access)

Aft Cabin Sole laminated directly over the hull bottom using 1/4" mahogany and ash. Countertops are laminated ash; Centerboard Trunk Caps are ash

Interior Trim, Door Jambs, and companionway jambs & thresholds ready for varnish (ash & black cherry milled from my own trees)

End of an ash Door Jamb notched for a 5/8" bulkhead

Joint of Companionway Jamb to Threshold

Custom-modified Aqualift Muffler

Foremast Tabernacle ready for fabric/epoxy. Step is solid w/ Ply Cap; Sides are full dimension 2x8 waterfront-quality pressure-treated yellow pine; Sides are 3/4" plywood

Wednesday, April 30, 2008

Installing the Bulwarks

Bulwark components are long-scarfed from marine-quality pressure-treated 2x4's

Using a 1/2" Drill Motor with a 3/8" square-drive and socket to install 1/4" x 5" hot-dipped-galvanized lag bolts 18" on center. Care must be taken not to break the bolts: tighten snug only; tighten further by hand using a rachet wrench. All bulwark components are "dry-fit" before glue. Bolts are left 1/2" up; bulwark layer is lifted with a prybar (see photo), glue is inserted with a 3" putty knife; lags are tightened.

Bulwark first layer on

Clamps are used to roll the bulwark in amidships to make it nearly verical. The bulwarks roll out in the ends to match topsides flare

Dry fitting the second Bulwark layer while torturing it into place. I broke this one at a scarf joint pulling the aft end in. Clamps align and torture

Using a flat bar to open the glue joint between layers.

3/4" Bungs are installed using lots of epoxy to cover and seal the bolt heads. Bungs are cut using a 7/8" hole saw in the drill press.

Thursday, April 24, 2008

Coachroof Construction

Coachroof Beams being varnished prior to installation; note routed mortises for Skylight Carlins

Coachroof Beam-ends showing rabbets for 3mm headliners & 3/4" polyurethane foam core

Aft Hatch Coaming with handle mortised into Coachroof Beam

Aft Coachroof in frame

Fwd. Cabin Coachroof in frame

Fabric/epoxy covering Houses (ends covered first)

Skylight Frame

All exterior fabric/epoxy work completed; Cockpit Pedestal in place (for compass & engine controls)

Saturday, April 12, 2008

Sheathing the Decks

Fabric/epoxy covering Decks

Decks covered; portlights cut out

Sunday, March 16, 2008

Foredeck, Cabin Trunk Sides

Foredeck showing Hatches above Vee-Berth & Forepeak Locker; Mooring Post; Foremast Tabernacle to left

Deck Frame above Vee-Berth showing Hatch/Skylight Frame

Using Template and router w/ 1/2" Flute Bit to mortise Coachroof Beam ends in Cabin Trunk sides

Cabin Trunk corner showing laminated Corner Post detail (with toes)

Monday, March 10, 2008

Galley, Pumps, Settee

Galley detail: Drawer-Bank, aperture for Gimbaled-Stove, Sink; Centerboard Trunk, Settee to right

Water Pump above port side Water Tank, in Cargo Hold under center Bridge Deck

Water Manifold under Galley Sink; Pump just on other side of Bulkhead

Aft Cabin: Settee to left, Companionway center, Refrig. Cabinet to right

Modified Aqualift Muffler under Cockpit Well

Side Deck Frame, Cabin Trunks, Cockpit

Deck in frame, looking aft on starboard side

Cabin Trunks roughed in; Cockpit Coamings started

Cockpit Detail, Seat Lockers port & starboard, Lazerette Hatch aft